Remodeling Milwaukee | Drop the wall

Let’s talk about it when framing a basement is going to be doing the drops or basically framing out around any duct work or beings that you may have. So personal I determine is, what’s the lowest point? Do you want, even if the ductwork is there a reason, you’re going to want to see to look at up and down ugly looking ceiling, remodeling milwaukee and what I mean by that is how we’re going to do that? Is he I’m taking off level and and putting it across the you know the doctor or whatever your trying to frame around so that you can easily determine what is the lowest point by holding it, holding it level up tight to the bottom of the ductwork, her posts, whatever once you’ve determined? What do you want? Remodeling Milwaukee Your lowest point is you’re going to want to add at least an inch and a half, but usually it’s better to go into 3/4 to 2 in to give yourself a good enough thickness to be able to get them to buy for framing across that there’s ways around you know, I haven’t actually run blocking directly underneath it. You know if there’s enough space some framing up in between each ductwork, you know for running a knee wall in between a duck. Tracy got something at least 24 in within 24 inches of each other, so you can get 5/8 drywall on there biscuit. You want to make sure that one way or another you have a nice level.

A nice level drop to work with the next thing. You’re going to want to determine is how far out is the is the drop going to come, and you know when framing around ductwork or high beams. Anything like that you’re going to want to double-check that the the beeman and stuff is straight with outside wall cuz, most times the beams are not straight, Remodeling Milwaukee especially if they don’t go wall-to-wall at the. Beam stops at a stairway or something of that sort, you’re, definitely going to want to double-check. Here you might romance off the outside wall per year. Teardrops by outside, while I mean that the stud wall that you had previously praying because there’s a better chance. If that’s going to be plum plum and straight, then there is for the the being itself to be straight. So what you determine what your measuring of how far out are you coming? You are not bust out your handy-dandy chalk line again and grab a buddy and you’ll make a line at each end of where you start. First going to start man and I snap alliance, oh, you have a point of reference to go to when you’re building your drop after using the two by 12 method, like we discussed you’re going to want to you, know, make sure the to i-12 is, is tall enough for what you’re for the total height of the trop and you going to make sure that it is the exact amount that you want and if it’s not you can either rip it down. You know by shaving a little bit off. You can lower your drop. You know if or what have you once you have your line snapped out? You want to ensure that the they mark an inch and a half back 4th and snap another line site.

You know exactly where the fuel by 12 is going and then on. The other side of that line is where you’re you’re blocking is going to go by 2 or 2 x4. That goes the same length. That way when you put your 2 by 12 up, so you just going to put the two-by-four up on the line. Inside edge of the beam in the two by 12 to be able to have a place for the enail to determine you can start figuring out if you’re going to splice the two by 12 or, if you’re, going to get it in one shot. Typically, we like to check out to buy 12s, for you know any cupping work, anything it’s basically keeping it from being perfectly straight. Remodeling Milwaukee You know you’re never going to get a truly perfect piece of wood, so we did try to get the most reasonable possible and you know it has less than a quarter inch of a bow to it. You know what the the width wise abdominal down the entire length of the peace, that’s pretty much as good as you’re going to be able to get. That’s all. That’s about as as good as you can find with those those types of wood in what we do with that, as well as we, if we mark wherever the high spot is so that when we start from one end of a 2 by 12, we can start working our way all the way down and making sure that it’s fast and really good up tight to the ceiling and then once we get to the other end where it starts, we can serve reason i, like a bottle jack for floor jack, something of that nature to press up on it in order to get it to kind of go into place and then once it’s up all the way will use the you know this way, and really nail it off to make sure that doesn’t move in sorry will deflect a little bit back after you have take a note. The weight off at city expected, but he just want to make sure it’s nothing crazy to where you’re having a large drop in your soffit ceiling drop. That being said, once you get that pretty well pretty well snailed up there, you going to go to the other side and do the exact same mirror. Image is going up to the wall cleat on the wall, to give yourself something to toe nail into with your soffit boards.

Once you got, the both sides set the hook on one end and do the same thing we’ve been doing is just measuring out ar-15 and a quarter 15 in quarters all the way down the length of the peace again. The reason why we do that is so:keep the drywallers on her happy side because down the road wilmer in to trim leah from signing time pump, the volume of created a nick, that’s going to be repaired, and if we take care of the drywall in the framing aspect and all they’re a lot more lenient with any sort of drywall repairs that have to be made after the. After all, the trim, work and stuff goes in. So it’s like to keep them. Remodeling Milwaukee Keep them as happy as we can in the same can be said, for you don’t want to go out of your way to make their life’s hard. It’s always better to work, a happy job environment than working with a bunch of krabby, a contractor’s cuz, not a whole lot in this world, that’s worse than working with a crappy contractor. They can make your life really miserable, but getting back to what the, what we’re doing, basically, with the the drop you’re going to want to take a string line and run it down to the total length of year to buy 12 to make sure that we did it all nice and straight.

You don’t want to melo ball your cross-bracing in and figure out that I’ll shoot the the drops not straight now it’s going to look really bad once you drywall it so I will do it, but the streamliners is running from end to end and will make sure that we have the soffit drop exactly where we want it. You know as far as plum and then Remodeling Milwaukee when we run the string down it’ll, give us a pretty good idea of whether or not the the board itself that has a twist to it or foes intervals out at the bottom. So if it does move one way or the other in there to try to straight that way, once we start talking versus something, crooked sounds simple again, but it’s a little things that really help you out in the end. That’s for sure, and then once you are going to get that all straightened out and I are just going to start measuring off of your your point said they pulled the 15, a courtesan and cutting all your so fat blocking. Typically, we only cut, install them and cut them down or, if need be, your cut new ones. If we cut too short and we can’t reuse it somewhere else, just cuz, you want to take your time and and make things easy on yourself just kind of a word from the wise and theme of things. Do you learn the hard way? Unfortunately,